Environmental Consulting Representative Projects
< Back to Representative Project List
Former Pneumatic Cylinder Manufacturer (Willits, California)
EnviroForensics® was retained by a federally appointed trust to conduct a court ordered RI/FS at a former pneumatic cylinder manufacturing facility. The facility manufactured cylinders as large as 48-inches in diameter from raw steel. The process of precision milling, painting and chrome plating led to subsurface impact of soil and groundwater with VOCs and chrome. Prior to initiating the RI/FS, EnviroForensics® conducted Interim Remedial Action Study for treating impacted groundwater at the site. EnviroForensics® ’s professionals were instrumental in the development of the Interim Remedial Measures, which had originally been required by the State of California, North Coast Regions- Regional Water Quality Control Board.
EnviroForensics® ’s regulatory expertise with the NCP and technical expertise at the site enabled them to develop a cost-effective RI/FS approach.