Fleet and Industrial Supply Center, Alameda Facility/Alameda Annex, Alameda, California

Environmental Consulting Representative Projects

< Back to Representative Project List

Fleet and Industrial Supply Center, Alameda Facility/Alameda Annex (Alameda, California)

Remedial Investigation/Feasibility Study Project Manager for technical and financial management of a 46-task, 2.5-million dollar Remedial Investigation and Feasibility Study (RI/FS). The RI/FS tasks include geophysical investigations, soil gas study, shallow and deep groundwater well program, stormwater system investigation, hydrogeologic evaluation for aquifer characterization, investigation-derived waste management and disposal, feasibility study, baseline human health risk assessment, ecological assessment, interim remedial action, radiological survey, site control measures, groundwater sampling program, and community relations. The US Navy used this project as an example of their expedited contracting process.