Alameda Reuse and Redevelopment Authority (Alameda, California)
Technical and Project Management of Utility System Master Plan, an environmental audit of existing utility system for the NAS Alameda and Fleet and Industrial Supply Center. These audits involved expedited turnaround times to meet the Base Realignment and Conversion for the client. Investigated potential effects on Base-wide contamination along potential areas of utility corridor re-alignment. The audit included the preparation of a reuse master plan for the sewer, water, electrical, gas, and storm water systems. This required coordination with the existing U.S. Navy ARC/Info system and available engineering design documents.